Data Center Commissioning Assurance

The independent check before you energise.

Criticon provides AI-assisted verification of commissioning test data, risk analysis, and independent assurance for data center projects. We catch what compressed timelines miss.

40%
of mission-critical projects hit overruns
33 wk
average equipment lead time in 2026
50%+
of projects delayed 3+ months
The Problem

Commissioning is where data centers succeed or fail.

The gap between construction completion and energisation is the highest-risk window in any data center project. Thousands of test data points across electrical, mechanical, and thermal systems need to be verified. Today, that review happens in spreadsheets, under time pressure, by engineers juggling multiple sites. Errors slip through. Systems go live with latent defects. The cost of catching a problem before power-on is a fraction of catching it after.

Reality 01

Compressed timelines kill quality

AI infrastructure demand is accelerating build schedules. Commissioning gets squeezed into shrinking windows, and manual review can't keep pace.

Reality 02

The builder grades their own homework

When the same firm designs, builds, and commissions a facility, independence is compromised. Operators and investors need a third-party voice.

Reality 03

Test data review is still manual

Commissioning engineers parse CSV exports and Excel files by eye. At scale, anomalies hide. Cross-referencing against design specs is slow and error-prone.

What We Do

Independent assurance, powered by AI-assisted analysis.

AI Test Data Review

Ingest commissioning test data from field instruments. Our AI flags anomalies, cross-references design specifications, and generates compliance-ready reports in hours, not weeks.

Risk Analysis

Proprietary pre-energisation risk scoring across electrical, thermal, and mechanical systems. Quantified readiness that operators, lenders, and insurers can act on.

Independent Verification

We don't design or build. We verify. True third-party assurance that the facility meets performance, safety, and sustainability specifications before power-on.

Process

From test data to confidence.

01

Data Ingestion

Upload commissioning test data from any format. Electrical load tests, thermal performance, mechanical system validations, UPS battery checks.

02

AI Analysis

Automated anomaly detection, spec cross-referencing, and pattern analysis across all subsystems. Catches what manual review misses.

03

Risk Scoring

Every system receives a quantified readiness score. Red flags are surfaced immediately. No ambiguity about what's ready and what's not.

04

Assurance Report

Independent verification report with findings, risk assessment, and recommendations. Designed for operators, investors, and compliance teams.

Every data center deserves an independent voice before the power goes on.

Based in Frankfurt. Serving the European data center build-out.